Tuesday 30 December 2008

Full Size Plan For 1st Board

Today after a little bit of a ride out, we have planned out ruffly the layout the the points on the 1st board.
The 1st half of the layout is to house the Maintenace shed, fueling point, along with 2 catch points, diamond cross over, a double slip and a 3 way point, not to mention a number of normal points.
2nd board will be planned shortly hopefully.



No comments:

Post a Comment