Saturday 27 December 2008

A New TMD takes shape

Quarry Lane TMD is not much of a layout at the moment, it is still very much in the planning stages.
The baseboard for the TMD will be 8' x 2'6", will have the fiddle yard, which will more than likely be cassettes self contained within the layout, it will be under the main line which will be part of the Southern mainline and have a PWay track gang working on the line.
As the layout is in the planning stage, I have no pictures as of yet, but all I can say is that the layout will have a reception and exit road, a PWay siding, along with siding for tamper and RHTT for work on the Southern line. Two road maintenance shed and a fueling bay.

I will post pictures of the locos that will be running in and out of the TMD in time and some pictures on the next stage of the planning after we have made the baseboards.

No comments:

Post a Comment