Today we set both the boards up on its legs and started to lay the track.
Got a nice deal done, and planned what we are going to do next time we have a session of track work.
Here are a couple of pictures.
These Pictures show the 1st board. were the 66 is sitting is the enterance and exit to the TMD.
To the right of the 2 roads in and out is a 3 way point which will go to a two road Shed and the 3rd an outside road along the side of the sed.
The other track going off to the Y point will be a two road fueling bay.
No comments:
Post a Comment