Sunday 21 February 2010

I havent posted on here for a long time, the boards that we made for the layout have been sitting in store.

Today we set both the boards up on its legs and started to lay the track.

Got a nice deal done, and planned what we are going to do next time we have a session of track work.

Here are a couple of pictures.







These Pictures show the 1st board. were the 66 is sitting is the enterance and exit to the TMD.
To the right of the 2 roads in and out is a 3 way point which will go to a two road Shed and the 3rd an outside road along the side of the sed.
The other track going off to the Y point will be a two road fueling bay.

No comments:

Post a Comment